Open Kitchen and AV equipment

April, 2018

3/30/18

Kitchen and AV Equipment

The last week of March saw delivery and installation of kitchen and Audio/Visual equipment. Upstairs the remaining furniture was removed and lights installed.


Kitchen Equipment brought in


Food Prep Island

Hand wash sinks installed and dishwashing equipment staged for installation.


Dishwash equip

In the kitchen and dining area, final trim work was done on the serving window openings and speakers were installed in ceiling.


Kermit Ylitalo works while everyone else is on break.


Break Time


Serving Window trim and Jim Granggroth and Dan Jarvi work on speaker installation.


Dan Jarvi

Upstairs the work continued as Projector and the balance of the lights were installed.


Projector installed by Bruce Herrala and John Nevala


Upstairs prep


Jon Bloomquist disassembles the lectern

Outside, prep for the air handling equipment continued on the east side after the trees are removed.


East side


Fire

As the final inspection day approaches, there is a lot of work for the electricians and the equipment people. The last thing in place to close out the month was the setting and plumbing of the dishwashing equipment. A full team of cleaners is scheduled for the coming week to prepare for carpet installation and set all the ceiling tiles. The goal is to be ready for Ministers camp in Mid April.


Upcoming Events

Feb 21, 2019

2019 LLC Winter Services

2019 LLC Winter Services Feb 21 – 24, 2019 Phoenix Laestadian Lutheran Church 32424 N. 43rd Street Cave Creek, AZ 85..

SUBSCRIBE TO OUR NEWSLETTER

Receive promotions and news by email. Unsubscribe with one click.